Cow Bedding Recycling System With Electronic Control System
Liquid mamure mixture pumped from the collection tank into a spiral extruded separator, and the separated solid part is transported to a stainless steel drum, where it is subjected to aerobic fermentation for 18-22 hours, resulting in a sterile organic bedding material that can be used directly in the bed of cows.
- Overview
- Related Products
Product Overview
cattle- bedding recovery unit
Manure recycling, reduce wasteemissions, become a valuableresource.In the future, more and moredairy farm will gradually usedry cow manure instead oftraditional bedding.
FEATURES AT A GLANCE
COMPACT DIMENSIONS
EXTENDING UNDERCARRIAGE
SAFETY FRAME
SIMPLE CONTROL
SEASY MAINTENANCE
VERSATILITY
EXTENDING UNDERCARRIAGE




PRODUCT SPECIFICATIONS
Core part |
Solid-Liquid Separator,GENGZE Own Brand, Double Press Auger |
Screen mesh |
Filter mesh: 304 Stainless Steel |
Drum |
Material: 8mm Thickness 304 Stainless Steel, mounded Germany Imported Motor, Two temperature sensors to monitor the drum temeature in real time, Inverted Auger Solution |
Electronic Control System |
High-wet corn: 40-70 tons/hour hay: 5-30 tons/hour |
Germany Imported Electrical Cabinet |
|
Material Level Controller Limit Switch RN3002
With Monitoring Function
|
|
Contactor/Breaker Switch/Thermal Relay |
|
Frequency Converter |
PRODUCT CONFIGURATION

Driven by Brand reducer

Siemens PLC control system

Dry material separated from Liquid manure mixture
Technical Features
(1)installation requirements:
it can be installed in the manure treatment plant, close to the sewage collection tank and the temporary storage tank.Workshope
effected insulation treatment, ensures that the indoor temperature in the cold season is not less than zero degrees Celsius.The
equipment covers an area of 15m 3.5m, and the recommended height of cornice is not less than 5.1m.
(2)technical parameters:
●Low temperature in the fermentating tank: 65-75 ℃
●Output: 48m3/d
●Fermentation time: 18-22h
●Dry material content of bedding 40%-42%
●Reduce up to 99% of harmful bacteria in the materials (tested by Shanghai animal disease prevention and control center:
staphylococcus aureus and streptococcus agalactiae are zero in the bedding material, the total number of colonies is 3X105CFU, the
MPN value of coliform group per gram <30, all within the permitted range).
(3)Processing technology:
Step 1: separate the coarse fiber (mainly undigested food such as corn, silage and hay) from the manure. The dry material content
after separation is about 37~38%.
Step 2: solid aerobic treatment - harmlessness and drying. Temperature: 65-75 ℃, dry material content is 40-42%.
(1)installation requirements:
it can be installed in the manure treatment plant, close to the sewage collection tank and the temporary storage tank.Workshope
effected insulation treatment, ensures that the indoor temperature in the cold season is not less than zero degrees Celsius.The
equipment covers an area of 15m 3.5m, and the recommended height of cornice is not less than 5.1m.
(2)technical parameters:
●Low temperature in the fermentating tank: 65-75 ℃
●Output: 48m3/d
●Fermentation time: 18-22h
●Dry material content of bedding 40%-42%
●Reduce up to 99% of harmful bacteria in the materials (tested by Shanghai animal disease prevention and control center:
staphylococcus aureus and streptococcus agalactiae are zero in the bedding material, the total number of colonies is 3X105CFU, the
MPN value of coliform group per gram <30, all within the permitted range).
(3)Processing technology:
Step 1: separate the coarse fiber (mainly undigested food such as corn, silage and hay) from the manure. The dry material content
after separation is about 37~38%.
Step 2: solid aerobic treatment - harmlessness and drying. Temperature: 65-75 ℃, dry material content is 40-42%.
Factory Display

Certifications

FAQ
Q : Are you trading company or manufacturer?
A: we are factory
Q: How long is your delivery time?
A: We have enough stock so that the delivery will be effected with in 7 days.
Q: Why we buy from you?
A: We have been the OEM for the most famous American brand more than 20 years, every part complies with the American quality
standard.
A: we are factory
Q: How long is your delivery time?
A: We have enough stock so that the delivery will be effected with in 7 days.
Q: Why we buy from you?
A: We have been the OEM for the most famous American brand more than 20 years, every part complies with the American quality
standard.